The studio
We work in small iterations and show a rough cut early, while it is still cheap to change. Structural notes are much less painful that way.
Order of work
- Board
- 1–3 days, discussed on a call
- Shoot
- usually a single day, sometimes two
- Edit
- from three days, rough cut shown early
- Grade and sound
- 1–2 days after the cut is locked
Two rounds of notes are included. Anything that changes the structure after the cut is locked is quoted separately — not out of stubbornness, but because it is effectively a new project.